Full Refurbishment Kingston·2025

Davidson House — Full Kitchen Refurbishment

Unit-by-unit kitchen refurbishment — stripped to the shell, rewired, replumbed and refitted — delivered around occupied student lets.

Davidson House — Full Kitchen Refurbishment
24

Kitchens refurbished

8 wks

Programme duration

0

Student relocations

100%

Quality pass rate

The challenge

What we were up against.

A complete kitchen refurbishment was required across multiple student accommodation units — involving full strip-out, new cabinetry, worktops, appliances, flooring, and electrical upgrades — all within a fully occupied building during the academic year.

Our solution

How Truman delivered.

Our multi-trade team delivered a phased kitchen refurbishment programme, working unit-by-unit to minimise disruption to residents. Each kitchen was stripped back to the structural shell, rewired, replumbed, and fitted with new units, worktops, appliances, and LVT flooring before a full redecoration and snagging.

  • All kitchens fully modernised with new cabinetry, appliances, and flooring throughout.
  • Zero student relocations required — works carried out around occupant schedules.
  • Completed on schedule with zero complaints from residents.

The transformation

Before & after

Drag the handle to compare.

Davidson House — Full Kitchen Refurbishment — afterAfter
Davidson House — Full Kitchen Refurbishment — beforeBefore

Something needs sorting?

Talk to a real engineer, not a call centre.

Get a quote

Tell us what needs sorting.

Planned programme or emergency call-out — send the brief and a named lead will come back within one working day.

Call 24/7+44 7490 291465Email[email protected]
Office167-169 Great Portland Street, 5th Floor, London W1W 5PF
HoursMon–Fri 8–18 · Emergency 24/7