Full modernisation of a 1950s student residence — rewire, plumbing overhaul, new flooring and fire doors — with 400+ students on-site throughout.

Roman House Student Accommodation Full Refurbishment
400+

Students on-site

16 wks

Programme duration

0

Student relocations

2 wks

Ahead of schedule

The challenge

What we were up against.

Roman House, a 1950s student residence requiring full modernisation — including complete electrical rewire, plumbing overhaul, new flooring throughout, fire door upgrades, and fresh decorators — all within a fully occupied building with 400+ students on site.

Our solution

How Truman delivered.

Our multi-trade team delivered a phased, floor-by-floor programme over four months. Works were carried out in sections to keep communal areas, kitchens, and bathrooms partially operational. Full strip-out was followed by new M&E, LVT flooring, fire-rated doors, and a full redecoration with student liaison throughout.

  • Full modernisation of a 1950s building to modern standards, with zero student relocations required.
  • All 400+ students remained on-site throughout the 16-week programme.
  • All works completed 2 weeks ahead of the agreed programme with zero complaints.

The transformation

Before & after

Drag the handle to compare.

Roman House Student Accommodation Full Refurbishment — afterAfter
Roman House Student Accommodation Full Refurbishment — beforeBefore

Something needs sorting?

Talk to a real engineer, not a call centre.

Get a quote

Tell us what needs sorting.

Planned programme or emergency call-out — send the brief and a named lead will come back within one working day.

Call 24/7+44 7490 291465Email[email protected]
Office167-169 Great Portland Street, 5th Floor, London W1W 5PF
HoursMon–Fri 8–18 · Emergency 24/7